Who we help · A decision-maker's guide

Different priorities.
Better building outcomes.

The decisions that shape a building's cost, comfort and long-term performance are connected. Start with the responsibility you carry—and explore what changes when the building itself can store and manage heating and cooling.

Start with your decision

Start with the decision that matters.

Choose your responsibility or the outcome you need to improve. Both lead to a practical project question, the tradeoffs to test and evidence worth reviewing.

Select the responsibility closest to yours.
Capital efficiency
What changes if we design around the peak load before committing the mechanical budget?

Compare baseline mechanical scope with a load-informed alternative; account for added integration costs and assess the effect on total project capital.

Decision lens: Early feasibility · Mechanical budget · Project returns
Explore capital planning
One building. Connected decisions.

Start with the building, then evaluate the systems.

Conventional planning often treats structure, HVAC capacity, energy demand and operating economics as separate decisions. Termobuild's air-driven approach integrates thermal storage with concrete floors and conventional HVAC to create another option for the project team to evaluate.

It does not eliminate the need for mechanical systems, ventilation, controls or backup strategies. The opportunity is to test whether the whole-building approach can deliver a better outcome.

  1. Define the project's constraint

    Capital budget, peak loads, comfort, operating cost or resilience.

  2. Compare realistic alternatives

    Establish a conventional baseline and model the integrated thermal strategy.

  3. Verify the whole-project economics

    Account for mechanical changes, structural integration, controls and ongoing operation.

  4. Decide with evidence

    Review project-specific performance, constructability and responsibilities before specifying a solution.

Evidence before promises

Don’t start with a promise. Start with the evidence.

Use these resources to examine what was estimated, what has been reported in operation, and how the approach integrates with conventional building systems.

Capital cost analysis

Explore an itemized historical conventional construction estimate and the project economics discussion.

Review cost analysis ↗

School operating performance

Review reported energy and operating performance from the Ontario school case study.

Review Ontario school ↗

How the system works

Understand how air-driven thermal storage works with concrete floors and mechanical systems.

Explore the approach ↗

Results and cost comparisons depend on project scope, climate, design assumptions and operating conditions. Historical estimates are not guarantees of future savings.

The next project decision

Find out whether your building is a fit.

Bring your project priorities, preliminary plans or current mechanical strategy. Start with an evaluation of where the building itself might improve the outcome.

Evaluate your project

No new equipment product to purchase. An integrated design and performance strategy to evaluate with your project team.